|
Date
Reported
|
Road
Condition
|
|
6/10/2006
|
On a ride of rt.124 fri. from Marlboro to Jaffrey, the road has been
scarified. Due to the recent rain, it has washed the residual pavement
left on the side, back onto the roadway in alot of
areas. Use exteme
caution, since this material is very small like sand...Raimo
|
|
06/09/2006
|
For those of you using Route 9 in the town of Chesterfield
be aware
that the PD will be having extra patrols this weekend and next weekend
looking for speeding motorcycles.
|
|
06/09/2006
|
Keene will be starting the roundabout constuction by KSC Winchester St, Main & Marlboro Sts in mid
July and run through Nov. There will be detours in place.
|
|
05/01/2006
|
5 miles of Route 9 in the Stoddard
area is being redone between now and
September
|
|
04/20/2006
|
Rt 9 in the Stoddard to Granite Lake area will be undergoing repairs
and once they start could be one lane at times with scarified pavement.
|
|
05/20/2006
|
Hello everyone,
Rt. 202 south, directley from the center of Jaffrey,headed toward
Rindge. The Southbound lane, is under some major construction. So be
aware, some loose sand and gravel may appear on the North bound travel
lane.
Ride and Have Fun! Raimo.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|